Floor Tile Installation
Porcelain, ceramic and stone floors set flat, with clean lines from room to room.
Floors, showers and backsplashes laid flat, straight and properly waterproofed by experienced tile setters. Request a free estimate in 10 minutes — no obligation, no pressure.
We'll respond within 10 minutes
We'll get back to you within 1 business day. Your info stays private.
We aim to answer estimate requests within 10 minutes.
Nothing to pay up front to get on the schedule.
Every installation is covered for two years.
Start your estimate without waiting for a visit.
From a kitchen backsplash to a restaurant floor, every job gets the same flat substrate, planned layout and clean grout lines.
Porcelain, ceramic and stone floors set flat, with clean lines from room to room.
Durable floors and walls for offices, stores, salons and restaurants.
Waterproofed showers, tub surrounds, niches and bathroom floors.
Subway, zellige, mosaic and patterned backsplashes cut neatly around outlets.
Old tile out, subfloor repaired and leveled before the new layout goes down.
Cracked tiles replaced, failing grout cleaned out and joints refilled.
Old tile, mortar and backer board come out with dust kept to the work area, and debris leaves with us the same day.
Subfloor checked for flex and soft spots, low areas leveled and the right underlayment or membrane installed. Most of a lasting floor is decided here.
Layout dry-fit so cuts land where they look intentional, then each tile is set, leveled, grouted and sealed where the material needs it.
Know the price before anything is booked: online measurements, a clear estimate and $0 deposit.
Get a free estimateReal bathrooms, retiled from the substrate up.
Three easy steps to a tile job done right.
Send the room, rough size and tile you have in mind.
Pick a start date; we plan prep and cure times around it.
Walk the finished room with us before we pack up.
Ready to get started?
Get a Free EstimateDemolition, leveling, backer board and waterproofing are listed in the estimate, so you see what the floor needs before work starts.
Tile and grout are not waterproof. Showers get a continuous membrane at seams, corners, niches and the drain before the first tile goes up.
We dry-fit and snap lines so cuts are balanced at doorways and walls, and the pattern stays square across the room.
Large-format tile shows every high spot. We check flatness, back-butter where needed and use leveling clips on big formats.
Inside corners, perimeters and changes of plane get flexible sealant instead of rigid grout, so tile has room to move.
If a floor flexes or a wall is out of plumb, we say so at the estimate instead of discovering it halfway through.
Every estimate spells out the job room by room, so you can compare it fairly and know exactly what you are paying for.
If something changes once the old tile is up, such as a soft subfloor or water damage, we show you, explain it and agree on it before doing any extra work.
Floor not in great shape? That is normal. Most rooms need some prep before tile goes down.
See removal & floor prepRoom-by-room work with one bathroom kept usable where possible, and clear notice of when floors can be walked on.
Evening, overnight and weekend installs, phased in sections so the business keeps operating.
Deliveries of tile and mortar planned around elevator bookings, dock windows and building quiet hours.
How we handle the buildings, subfloors and paperwork in each city we serve.
Prewar bathrooms, brownstone kitchens and Midtown lobbies.
Bungalow baths, greystone kitchens and Loop high-rises.
Craftsman homes, Buckhead baths and Midtown towers.
Slab-on-grade floors, Heights bungalows and Galleria offices.
Ranch homes, desert patios and Camelback offices.
It depends on the floor or wall area, the condition of what is underneath, tile size and pattern, waterproofing in wet areas, trim and transitions. We start with online measurements and give you a written estimate before anything is booked.
Usually, yes. Setting new tile over old tile raises the floor height, hides cracks that can come back through, and voids many product warranties. We remove it, check the subfloor and prepare a flat, sound surface.
A backsplash is often one to two days. A bathroom floor takes two to three days, and a full shower usually runs four to seven days, because waterproofing, mortar and grout each need time to cure.
Yes. Commercial work can run in the evening, overnight or on weekends, and larger floors are phased in sections so customers and staff can still get through.
No. We work with a $0 deposit, so there is nothing to pay up front to book your installation.
Yes. Every installation comes with a 2-year workmanship warranty.
Tile is only as good as what is underneath it. Get a free estimate in 10 minutes — no obligation, just honest advice from experienced tile setters.
We'll respond within 10 minutes
We'll get back to you within 1 business day. Your info stays private.